Ukrainian NPPs have reached the planned capacities – Ukrenergo
Emergency restoration works are ongoing throughout Ukraine
What happened? Nuclear power plants of Ukraine, except Zaporizhzhia NPP, reached the planned capacities.
Source. NPC Ukrenergo on Facebook.
Details. “Exception – the occupied Zaporizhzhia NPP that continues to stay in the mode of unit shutdown,” the statement reads.
According to NPC, the volume of electricity consumption on Sunday increased compared to yesterday, which influenced the indicators of the deficit in the system. This is due to both the damage to energy infrastructure facilities during the 9th missile attack and the seasonal drop in temperature.
“All oblast power distribution companies have been informed about consumption limits. If they are exceeded, emergency shutdowns may be applied,” Ukrenergo reminded.
It is noted that emergency repair works in high-voltage and distribution networks as well as at power plants are ongoing throughout Ukraine. At the same time, weather conditions (increased frosts, strong winds) complicate repair works.
If you have read this article to the end, we hope that means it was useful for you.
We work to ensure that our journalistic and analytical work is of high quality, and we strive to perform it as competently as possible. This also requires financial independence. Support us for only UAH 196 per month.
Become a Mind subscriber for just USD 5 per month and support the development of independent business journalism!
You can unsubscribe at any time in your LIQPAY account or by sending us an email: [email protected]